01 / Our purpose

We build the systems
that keep fleets
moving.

Know who took it. Know where it went.Fueltek makes every fuel issue visible: what remains, what changed and what needs to happen next. Hardware, software and support are designed around the reality of the operating site. Explore customer projects →

Outdoor commercial fuelling island with multiple Fueltek units.
Fuel management / Installed systemsControl has to work where the work happens.

A short history / Blackburn, Lancashire

2001

Representational contemporary engineering drawing and measurement work
System planning begins with the operating requirement.

Fueltek Limited was incorporated on 7 February 2001. The purpose was practical from the beginning: make commercial fuel control clearer, more accountable and easier to operate.

From Blackburn, that idea grew through secure identification, controlled dispensing and dependable transaction records. The physical event at the pump became information an operator could understand and act upon.

As communications developed, Fueltek connected sites to browser-based reporting, multi-site oversight and tank intelligence. The system became broader, but the principle stayed the same: solve the real operational problem and support it for the long term.

Verified company record ↗
2001 — 2026

The Fueltek
story.

Twenty-five years of practical fuel-management engineering.

Contemporary representational engineering drawing and measurement work
Engineering starts with the real requirement.
01 / The beginning

Built around a practical purpose.

Fueltek is incorporated in Blackburn with a clear purpose: make commercial fuel easier to control and account for. From the beginning, the work connects engineering detail to the everyday reality of the operating site.

Hands inspecting components inside a fuel management unit
Control at the point where fuel is issued.
02 / Early yearsControlled issue

Person. Vehicle. Fuel.

Identification, controlled dispensing and stored transactions establish the connection between the person, vehicle and fuel issued. That dependable record gives operators a clearer way to manage access and accountability.

Fuel management software dashboard supporting connected Fueltek systems and operational reporting
Connected information supports the physical system.
03 / Connected eraFrom depot to browser

The site becomes visible.

Fueltek FMO extends the system into connected reporting for users, vehicles, transactions, stock and multiple operating sites. Fuel information can move beyond the depot and become something a wider team can review and act upon.

Representational overhead view of a connected Fueltek fuel-management site with tanks, dispensers and monitoring
Storage, dispensing and monitoring work as one system.
04 / Tank insightKnowing what remains

Stock gains another view.

Tankwatch adds stock, ullage, delivery and alarm information, giving operators another view of the fuel under their control. Tank intelligence complements transaction records and helps the complete site tell a clearer story.

Exterior of Fueltek's Blackburn building, showing its entrance and signage
Every department contributes to one working system.
05 / Employee ownership

The next chapter belongs to the team.

Fueltek enters employee ownership, placing the next chapter with the people who design, develop, build, install, sell and support its systems. No single department keeps the business moving; the strength is how the whole team works together.

Representational future connected Fueltek engineering facility
Built on experience. Engineered for what comes next.
06 / Twenty-five years

Still building.

A quarter-century after incorporation, Fueltek continues to develop practical hardware, software and support around real working sites. The technology changes; the standard remains: understand the requirement and make the complete system work.

Fueltek’s development spans controlled dispensing, connected reporting, tank monitoring and long-term support.

Designed. Developed. Built. Supported.

02 / Design · develop · build

One idea.
Every stage.

One team carries the idea through.The people who understand the requirement stay close from drawing and development to build, installation, connection and the support that follows.

Representational contemporary engineering design work
01 / Design
Understand
the site.

Every system begins with the real operating requirement: the people, vehicles, fuel, equipment and information that have to work together.

Hands working on internal fuel management equipment
02 / Develop
Turn the idea
into a system.

Hardware, software and communications are developed as one working solution, with the detail tested before it reaches the customer.

Representational close-up of an engineer wiring an industrial control cabinet
03 / Build
Make every
detail count.

Careful assembly, wiring and inspection turn the specification into dependable equipment ready for a real working site.

Fueltek fuel dispensing equipment and company van at an outdoor installation
04 / Support
Stay close
after install.

Commissioning is not the end of the relationship. Support comes from people who understand the equipment and the wider system around it.

From system design and manufacture to commissioning and ongoing support.

03 / The people

Built by people
who know
the system.

No single department keeps Fueltek running. The team does.Engineering, IT, development, production, installation, sales and support all depend on one another. Every role matters and every handoff matters. When one department is missing, the whole business feels it; working together is what keeps Fueltek moving smoothly.

Every departmentOne team

Fuel management software dashboard supporting connected systems, operational reporting and business continuity
IT & developmentServers / Networks / Software / Business continuity
Engineering drawing used to support fuel management project planning and specification
Sales & project guidanceListen / Understand / Specify / Stay connected
Hands inspecting internal fuel management components
Support what we buildTechnical support / Connected systems
Representational hands completing industrial wiring
Knowledge in the handsBuild / Test / Commission
Fueltek's Blackburn building with its sign above the front entrance
One team keeps Fueltek movingEvery department / Every role / One shared result

Engineering, development, production, installation, sales and support work together around the complete customer system.

04 / How we work

Principles, not posters.

01

Build it properly.

Start with the real requirement. Engineer the detail. Test what will matter when the system is in use.

Engineering drawing
02

Know the customer.

A depot, a fleet and an operating team are not abstract specifications. The right answer begins with how the site actually works.

Real requirement
03

Keep it working.

The relationship continues after installation. Support should come from people who understand the system around the problem.

Support after install
04

Never stop improving.

Hardware, software and communications change. Good engineering keeps useful equipment useful while making the system better.

Design for the long term

05 / Our approach

Don't throw away
what still works.
Make it better.

Progress does not always mean starting again.Where the existing installation is suitable, Fueltek can improve control and identification, communication and reporting around it.

Hands checking components inside a fuel management unit
Improve / Integrate / ExtendEngineering should make the useful parts of a site more useful.

7 February 2001 → 7 February 2026

25Years
of Fueltek

From first sketch to support after installationEvery stage. One shared standard.

  1. 01Design
  2. 02Manufacture
  3. 03Software
  4. 04Installation
  5. 05Support
  6. 06What comes next

06 / Place and identity

Built in
Blackburn.

Engineered here. Proven far beyond it.Large enough to engineer connected multi-site systems. Close enough to understand the individual depot, its equipment and the people relying on it.

Exterior of Fueltek's Blackburn building with sign, loading bay and entrance
Blackburn / LancashireEngineering, development, production and support from Fueltek’s Blackburn base.

07 / Working in the real world

Built here.
Working everywhere.

Different sites. One engineering standard.Across depots, fleets, plant, emergency services and working sites, every requirement is different. The standard should not be.

Buses parked at a depot with staff alongside them
01 / Bus & coachA depot wakes up.
Representational UK haulage depot operating at night
02 / LogisticsThe fleet is still moving.
Representational construction plant beginning work in a quarry
03 / ConstructionThe conditions do not wait.
Representational fire and rescue vehicle depot before a shift
04 / Emergency servicesReady whenever the call comes.
Representational agricultural machinery in a wet British farmyard
05 / AgricultureAnother working day, whatever the weather.
0105

Customer projects

See the work behind the story.

Explore how different operating requirements shaped the equipment, identification workflow and reporting in these Fueltek projects.

Browse all 13 customer projects

Local authority · Depot replacement

Blackburn with Darwen Borough Council

The Davyfield Road project brought diesel and gas-oil storage, FT4000 access control and Tankwatch monitoring into one managed depot arrangement.

Read the council depot case study

Plant · Identification at the nozzle

T&M Plant

Feedback about repeated movement between the vehicle and terminal helped shape the DataNozzle workflow, with vehicle identification at the dispensing point.

Explore the DataNozzle project

Rail · Reporting handover

LNER & Hitachi

Existing FT4000 and Tankwatch systems supported a defined reporting cut-off as responsibility for Craigentinny and Ferme Park transferred between operators.

Read the rail handover case study

08 / What comes next

Technology changes.
The standard
shouldn't.

Employee-owned. Still engineering forward.Fueltek entered employee ownership in 2024. The next chapter carries forward the same practical idea: understand the site, engineer the right system, support what we build and keep improving it.

Fueltek — Making your fuel go further

2001—2026—Next

Built on experience.
Engineered for what’s next.

Stillinnovating.

DesignedEngineeredBuiltSupported

Trusted by industries.Dependable every day.

A quarter-century of practical engineering behind us.The next system is already taking shape.

25+Years of
Fueltek engineering

Fueltek Limited / Company 04154972 / Blackburn, Lancashire

Practical guidance

Engineering, experience and opportunities

Explore the work, the supporting documents and opportunities to join the team.

Technical information

From individual equipment to a complete installation

Fueltek designs and develops its fuel management equipment and software, manufactures its dispensing/control equipment, and specifies and supplies the wider fuel installation.

Upgrade where appropriate

Review compatible existing equipment before deciding on replacement. The aim is a practical long-term system, whether the requirement is one fuel point or a connected depot network.

A coordinated project

Site surveys and demonstrations help define the requirement. Fueltek can coordinate integration, installation, commissioning and support for the agreed scope.

Support as the operation changes

Remote diagnosis, software assistance and field-engineer support can help maintain or extend the installation. Agree the support arrangement for each site.

Scale and ownership

We work with individual depots and national fleets. We do not charge for additional software users; your quotation sets out the wider software, communications, integration and support services.

Email sales[email protected] WhatsApp our Sales TeamWe’re just a click away